Home | Previous Page | Next Page   Installation and Initial Configuration >

Testing the Connection

The following tests ensure that you followed the relink and install procedures correctly and that the connection between the Optical Subsystem and the optical-storage system is operational.

Home | [ Top of Page | Previous Page | Next Page | Contents | Index ]