Informix Error -25711: No more than three connections can be involved in a single fastpath call.
Cause and resolution
No more than three connections can be involved in a single fastpath call.
You executed a routine that opens a remote connection that in turn calls another routine that opens a remote connection, and so on. The result is that the nested routines try to open more than the maximum allowed number of connections.
Examine your routines and reduce the number of connections requested.
Oninit® Troubleshooting Guidance
Reasons / Common Causes
-25711 fires when nested remote-routine calls open more than three connections in a single fastpath call — per the official guidance, a routine that opens a remote connection calling another routine that opens yet another remote connection, and so on, exceeds the maximum.
- Nested remote-connection-opening routine calls exceeding three connections, per the official guidance — the direct, only cause.
Solutions / Resolution
- Examine your routines and reduce the number of connections requested, per the official guidance.
Examples
N/A
No specific triggering statement is documented beyond nested routines opening more than three connections.
Diagnostic Checks
- Trace the chain of nested remote-connection-opening routine calls, and reduce it to at most three connections.
Related Errors / Related Topics
- -25710 — "Invalid routine structure in server to server fastpath call." A related fastpath error, on routine structure rather than connection count.
- -25712 — "Routine <routine_name> cannot be called from a remote server." A related server-to-server fastpath error, on routine installation.
- -25713 — "Attempting to run a cross server routine <routine_name> in parallel." A related server-to-server fastpath error, on parallelizability.
Nested remote-routine calls exceeded the three-connection limit for a single fastpath call — reduce the connection chain.