Re: Xfer from Test to Devel
Posted in 1998
Carlson@WHSmith wrote:
> Steve Romankiw wrote:
> >
> > When we transfer between Test and Development (located on same machine), I
> > typically do an DBEXPORT from test followed by an DBIMPORT into
> > development. This is a slow process.
> >
>
> Sounds like you're looking for a full dataset.
>
> > Are other options available? For instance, can I create a onpload image
> > of my test environment, unload test, and reload into development using the
> > image.
>
> We've been quite successful in restoring a production level0 archive to
> our test system. We have identical logical layouts between systems.
> MUCH faster than dbexport/dbimport or unload/load.
>
> John Carlson
> Informix DBA
> WH Smith, Inc.
I have identical logical layouts for Prod db instance and Test db instance on
thesame Unix machine, because they have different instant name I wasn't able to
Xfer
with ontape and have to use dbimport. Does your systems located on the same
machine or on a different machine?
Naibin Chen