RE: Informix 7.30 (I know!)
Posted in 2007
If you are logging (and of course you are, 'cause it's production) and you don't have raw tables or blobs, then try this. 1. Old Box - back up logical logs continuously 2. Old Box - while On-line, level 0 archive 3. New Box - restore level 0 archive 4. New Box - answer 'N' to level 1 restore 5. Old Box - Stop logging - switch tapes and restart logging 6. New Box - answer 'Y' to log restore. 7. New Box - use the first log tape and apply logs 8. Do Steps 5-7 until you are ready to switch over to New Box Then get it down to only 5 minutes from the last log restore, this will make your last log restore very small and the switchover should be a very small downtime. One more tip do not have (m)any open transactions at the point of switchover. HTH, Zev Berezin -----Original Message----- From: informix-list-bounces@iiug.org [mailto:informix-list-bounces@iiug.org] On Behalf Of navdeep virk Sent: Tuesday, May 29, 2007 12:59 PM To: art.kagel@gmail.com; informix-list@iiug.org Subject: Informix 7.30 (I know!) We have a need to migrate the database from a running Production server on to a Pre Production machine which will eventually replace the Production Machine. This is a Transaction Processing system so we want the migration to happen without any downtime. We plan to take level "0" back from the Old box , restore to the new box and then apply the delta using scripts( Unload /load) to bring the data in sync. Is there a way by which after we have taken a level "0" backup , we can then take another backup of whatever changed after level "0" and apply that to database using some informix utility.I am not sure if a Level "1" will do the job as while the Level "1" is being restored we will have a down time. NSV _______________________________________________ Informix-list mailing list Informix-list@iiug.org http://www.iiug.org/mailman/listinfo/informix-list