Enterprise Management Summit '94 - Theater Scenarios
Posted in 1994
NOTE: Because of the high volume of requests for information about the theater presentations at Summit '94, we are posting these "scenario" descriptions. Any suggestions about how to refine them is appreciated. (We have cross-posted this article but we apologize in advance if you should see it more than once.) Information about Summit '94 can be requested at 1-800-340-2111 or 415-512-0801. Fax: 415-512-1325. EMail: emiinc@mcimail.com or summit@ix.netcom.com. ---------------------------------------------------------------- Enterprise Management Summit '94 - Enterprise Management Center - Purpose/Function ===================== The Enterprise Management Center will be built in the theater of the Santa Clara Convention Center during the week of November 14-18, 1994. (The Theater track will run in addition to the exhibit floor). Vendors participating in the Theater are Bull, Computer Associates, DEC, HP, IBM, and NetLabs. Each vendor has 90 minutes to respond to the scenarios listed below which are constructed around a user's typical day. It is intended that these scenarios will require each vendor to present all aspects of their management products (thus minimizing demo hype) and put the emphasis on solutions. Overview of Theater Scenarios =============================== Introductions 5 minutes Part I Asset Management 10 minutes Part II - Fault Management ("A typical Day At the Help Desk") 45 minutes Part III - Administration 15 minutes Summary 15 minutes Introductions (5 minutes) ============================== To begin the presentation, the vendor will take the stage along with a narrator (provided by Summit '94). The narrator will announce each section of the presentation and each scenario by number. The vendor will introduce speakers and personnel operating the software and will then highlight architectural aspects of their product(s) including "partnering" products (e.g.,trouble ticketing). Part I - Asset Management (10 minutes) ========================================== Scenario 1: Auto-Topology ----------------------------- Vendors will be expected to discover only the Theater network. (The Theater network will be connected to the network on the exhibit floor via a router.) This process will be started at the beginning of this scenario. If it requires more than 10 minutes, it will become a background task and can be revisited at the end of the presentation. Theater Networks: TCP/IP - Theater/Showcase (at least 3 sub-networks with approx. 50-100 devices) SNA - Theater only DECnet Phase IV - Theater only Novell - Theater only Theater Nodes: RS6000 with AIX HP 9000 700 Series with HP-UX Sun with Sun O/S, Solaris X-Windows terminal PS/2 with OS/2 486 Processor with DOS/Windows Processor with Windows NT and Hermes agent Macintosh Scenario 2: Inventory --------------------------- A new piece of equipment is installed and needs to be recorded in the inventory. Information to be recorded includes: Equipment information (Example) type (e.g., router) Router manufacturer Wellfleet model BCN serial number 43086-2 owner PPSD administrator Dave Anderson Location Physical Room 109, 3323 Central Avenue, San Jose, CA Network address 192.225.32.250 The above data for each of the fields are only provided as examples. Each vendor may choose the exact information which they enter and may define additional details. Part II - Fault Management (45 minutes) =========================================== Scenario 3: Network Analysis 8:00 A.M. --------------------------------------------- A user calls to complain that response time is slow. The cause is packet congestion. The congestion will be induced with a hardware device (a probe). * Determine that the cause is traffic congestion. * Resolve the problem. * Notify the user of the resolution. Scenario 4: Multiple Alarms 9:00 A.M. --------------------------------------------- There is a flood of alarms (possibly 20-30) when the connection to segment A of the showcase network is lost. * Isolate the root problem (i.e., the loss of connectivity to the segment). * Resolve the problem by dispatching service personnel to "repair" the cable. * Clear any outstanding alarms associated with the problem. The problem will be generated by activating a software filter in the router connecting the theater to the Showcase. In addition, a script running one of the systems, will send out the series of traps. Note: Detailed information about the traps to be produced will be supplied after all of the equipment information is obtained from each of the participants. Scenario 5: Spool Space 10:00 A.M. ----------------------------------------- The file system on one of the systems in the Theater fills up. Therefore there is not any spool space available. The vendor will be allowed to select the environment where the problem occurs. Summit '94 will present the scenario on the "Manufacturing System" in the Theater. If a vendor wishes to deal with this scenario on a different system they will be responsible for providing the system and producing the scenario on it. Scenario 6: Data Base 11:00 A.M. ------------------------------------- There is a problem (too much fragmentation) with an Oracle data base. Each vendor will be assigned a specific data base (file) which they will be responsible for fixing. The files will be identical. However, each vendor will be assigned a unique data base to work with in order to avoid the need to reload data bases between sessions. The scenario will be presented on the "Accounting System." Scenario 7: DECnet/SNA 12:00 P.M. ------------------------------------------ The vendor should choose one of the two following network problems: (a) A problem occurs in a DECnet. (b) A problem occurs in an SNA network. Resolution requires an IML command to be issued to a remote controller. Scenario 8: Work Group Support 1:00 P.M. ---------------------------------------------- User, on a Novell network, calls to report that their job is not printing. The cause of the problem will be that the paper is out of paper. It will be necessary to determine that the lack of paper is the cause of the problem and arrange for someone to load more paper. Scenario 9: Trouble Tracking 3:00 P.M