Mark,
I did.
When I took a client from 9.0x to 10.01 the upgrade path was a bit bumpy.
There are a couple of extraneous things left on the system, and the performance was not
up to par.
In a training exercise, I had a junior employee bounce the system and rebuild from
scratch. The amount of disk space available improved, since HP did move a
few things around and since we didn't have 9.x, we didn't need them. So, it
was a cleaner install.
My HP712 at home died. (Fatal Disk Crash.) While under warranty, I got the new
disk, and decided to do a rebuild. System was a bit faster.
While the 9.x -> 10.x upgrade path exists, it will work. But the re-install is even better.
There are other hints you can do too.
Another reason for a re-install, is that it is most likely that your system has changed,
and you may want to consider reallocating resources.
-HTH
mikey
Mark Collins wrote:
> Well, we're finally getting ready to upgrade the O/S on our production systems, and I have
> a couple of questions. First, the environment - DSA 7.10.UC2 (I know, I know, but it keeps
> running), HP-UX 9.04. We're upgrading to 7.23.UC1 and 10.20. Prior to the upgrade, I plan
> on taking two ontape backups (because I'm paranoid).
>
> The questions revolve around the HP-UX portion. First, I believe someone last week
> recommended performing a cold install of HP-UX, rather than upgrading. Why?
>
> Second, if a cold install is performed, then I'm assuming that the current LVM
> configuration will be lost, thus we would have to re-create the logical volumes in the same
> sizes and create the appropriate links, then do a full restore of the database. Is this
> correct? If so, it will add many hours to the upgrade process. I'd appreciate any
> comments from people who have performed a similar upgrade.
>
>
>
> Mark Collins
> mcollins@us.dhl.com
>
> The problem lies in how easily and dangerously we forget that
> manipulating things is not the same as understanding them.