Re: Xfer from Test to Devel
Posted in 1998
Naibin Chen wrote:
>
> Carlson@WHSmith wrote:
>
> > Steve Romankiw wrote:
> > >
> > > When we transfer between Test and Development (located on same machine), I
> > > typically do an DBEXPORT from test followed by an DBIMPORT into
> > > development. This is a slow process.
> > >
> >
> > Sounds like you're looking for a full dataset.
> >
> > > Are other options available? For instance, can I create a onpload image
> > > of my test environment, unload test, and reload into development using the
> > > image.
> >
> > We've been quite successful in restoring a production level0 archive to
> > our test system. We have identical logical layouts between systems.
> > MUCH faster than dbexport/dbimport or unload/load.
> >
> > John Carlson
> > Informix DBA
> > WH Smith, Inc.
>
> I have identical logical layouts for Prod db instance and Test db instance on
> thesame Unix machine, because they have different instant name I wasn't able to
> Xfer
> with ontape and have to use dbimport. Does your systems located on the same
> machine or on a different machine?
>
> Naibin Chen
Oh great . . . NOW I actually read the original post. Unfortunately,
the words "same machine" are just now registering. Too much coffee, I
guess . . . 8-)
My recommendation will work where test and prod are on different boxes.
Unfortunately, the only thing that I know would work on the same box
would be 'dbexport/import', 'unload/load', or 'onunload/onload'
Sorry for the confusion . . .
John Carlson
Informix DBA
WH Smith, Inc.